Road and Bridge Construction

Proposed 2025 County Project Schedule:

May 1 - June 23

Division 2 Road Construction

Twp Rd 484 between Rge Rd 102 and Rge Rd 103

1.0 miles

Back sloping and grade widening

May 6 - June 4

Division 3 Bridge Culvert (BF 78718)

Twp Rd 512 West of Rge Rd 80

Entire bridge culvert replacement

June 18 - July 26

Division 7 Bridge Culvert (BF 75589)

Twp Rd 532 West of Rge Rd 155

Entire bridge culvert replacement

June 23 - September 19

Division 3 Road Construction

Rge Rd 85 between Twp Rd 512 and Rge Rd 84A

1.2 miles

Back sloping and grade widening

July 8 - August 1

Division 5 Bridge Culvert (BF 01819)

Rge Rd 123 South of Twp Rd 512

Entire bridge culvert replacement

September 19 - November 6

Division 1 Road Construction

Twp Rd 490 and Rge Rd 85

0.4 miles

Slough and intersection upgrades

TBD

Division 5 Bridge Culvert (BF 01195)

Rge Rd 134 South of Hwy 16

Entire bridge culvert replacement

TBD

Division 7 Bridge Culvert (BF 75604)

Rge Rd 145 South of Hwy 631

Entire bridge culvert replacement

TBD

Division 4 Bridge Repairs (BF 01865)

Twp Rd 532 West of Rge Rd 142

Bridge maintenance and repairs

TBD

Division 1 Bridge Repairs (BF 74718)

Twp Rd 502 East of Rge Rd 85

Bridge maintenance and repairs